Beech Park (Foxrock)

New project at Beech Park ready to start in the next couple of weeks.

See below some of the first drawings and sketch up images we did for this house.

BER cert for our house in Clontarf

The Building Energy Rating (BER) is an indication of the energy performance of this dwelling. It covers

energy use for space heating, water heating, ventilation and lighting, calculated on the basis of standard occupancy. It is expressed as primary energy use per unit floor area per year (kWh/m2/yr).

‘A’ rated properties are the most energy efficient and will tend to have the lowest energy bills.

Apartment renovation at Richmond Court

2 bedroom apartment at Richmond Court (Milltown). Pictures of the kitchen coming soon.

Apartment for rent. All furniture by Ikea. Bathroom (sanitary ware and tiles) by TilesMerchant.

Hollywood drive (Dublin 14)

Here are some images from a 3d model for our new project in Dublin 14. The challenge in this project was to consolidate the main house and subsequent additions, which looked quite chaotic, into one harmonious unit.

We have met our clients early this week and they are delighted. At the moment we are working on a few adjustments so we can get it ready for planning very soon. 

 

 

New planning application launched in Killiney

Construction of single story extension to rear,  side and front of house with connected  canopy over front door , associated internal alterations, drainage and external works all at  Bayview Lawns, Killiney, Co. Dublin.

Kitchen extension and landscaping at Sion Hill Avenue

Before and after pictures of this Ground Floor extension at Sion Hill Avenue (Harolds Cross).

Reusing the bricks from the existing extension to match existing was an essential move for the final look in this project.

New Mews in Cranmer lane

New  3 bed Mews in Cranmer Lane (Gran Canal Dock) is almost ready for completion.

See below a few details of the finishes. More pictures coming soon.

Refurbishment of existing dwelling at North Strand, Dublin 3.

Our "pink house" for Julie, a tailor and gardener living in Dublin 3, it's almost finished. The works have involved: demolition of two existing chimneys, new pitched roof including location of rooflights to studio and staircase area, open up of windows at front and back of the house, new kitchen layout and new location of ground floor bathroom.

Pictures of the inside layout and front coming soon. 

Bessborough.jpg

Back extension in Rathfarnham

We are trying a few different layouts for a new house extension at Beaufort Downs. these are the first sketches and today we will be working on on a 3D image in Sketch up to test the inside and outside implications of the extended building. We are really excited about this new job!

Extension and refurbishment at Ashlawn, Ballinteer.

Ground Floor Plan for this back extension and refurbishment at Ashlawn, Ballinteer.

The job is almost finished now and it is looking really good. This is only one of many different projects which have been successfully completed in the last few months by DC Architects...more pictures coming soon !.

Updating from Beaumont Av. and Orchard Way.

We are delighted with the finishes for both houses at Beaumont Avenue and Orchard Way.! next couple of weeks are going to be critical on site.. but it will be worth it, it's looking really good. Happy Easter everyone !
      

Visit on Site: Beaumont Avenue.

The site on Beaumont Ave. Churchtown is well advanced, so we needed to start thinking about the different layouts for kitchen, bathroom and utility in both houses. We think that there is no better way to make a good decision than visit the site one more time, right after we had spent a few hours drawing at the office.

We took a few pictures this morning to show you the actual state of the construction.